The mobile concrete mixing station is a concrete production equipment that integrates the material storage, weighing, transportation, mixing, unloading and full-automatic control system of the concrete mixing station with a trailer unit; It is completely the same as all action processes, operation methods and maintenance of fixed automatic mixing station; At the same time, it has the unique characteristics of flexible movement, fast and simple disassembly, simple deposit handling and so on; It is an ideal model for mobile construction of highway, railway, bridge, port, hydropower and other projects.
1. Main engine chassis: cantilever mixing main engine chassis, which contains Trailer Truck traction pin and parking outrigger; The measuring scale of mixer, cement and water admixture shall be placed on the chassis; Patrol walking platform, railing, etc. are attached around.
2. Control room: the control room is at the bottom of the chassis of the main engine and is equipped with a full-automatic control system of the mixing station. The control system is the same as that of the fixed mixing station. Under operating conditions, the control room is used as the front support point of the whole station. During transfer transportation, the control room is stowed and stored in the space in the support; All control circuits need not be disassembled.
3. Aggregate batching measurement: this system is located at the rear end of the whole station, and the upper part is the aggregate (sand and stone) storage hopper. The storage hopper can be divided into 2 or 4 grids, and an heightening plate is set to increase the storage capacity. Pneumatic sequential door opening operation. Aggregate measurement is a cumulative measurement method of various materials. The bottom is equipped with walking rear axle and structural outrigger during operation.
4. Belt conveyor frame: the frame is a truss structural member connecting the host chassis and aggregate batching structure, with a belt frame inside; The main frame, belt frame and batching structure are integrated to form the main structure of the whole mobile mixing station
5. Peripheral parts: cement silo and screw conveyor. The peripheral parts are integral parts during operation or transportation without disassembly, so they can be transported and disassembled as a whole.
6. Mixer: JS type forced mixer is generally used, which can quickly and evenly mix and complete the fluidity and dry and hard concrete.
Address: No. 818, Jingshi Road, Jinan, China
Tel: 0086-531-87453566
Fax: 0086-531-87453566
Postal Code: 250306
Email: sdjkgroup@163.com
jianke3566@163.com