Do you know the precautions for using concrete mixing plant?

2021-07-06 09:37:30
second

Concrete is often used in our daily buildings, and we are familiar with the corresponding concrete mixing plant. What should we pay attention to when using it? Let's take you to understand it!

The installation of concrete mixing plant shall be carried out by relevant personnel according to the provisions of the factory manual, and the commissioning shall be organized under the auspices of relevant personnel. It can be put into operation only after all technical performance indexes meet the provisions and pass the acceptance. The mixing plant must be operated according to the specified operating procedures, so memorize the function of each button, knob and indicator on the control panel of the program control box and understand the operating procedures. Be familiar with the structure and performance of the mixing plant; The personnel who are familiar with the concrete mixing process and have passed the strict examination and obtained the "operation certificate" shall carry out the operation.



Do you know the precautions for using concrete mixing plant?


Before using the mixing plant, the supporting equipment of the mixing plant shall be equipped as required. Before starting, check whether all switches of the distribution cabinet are closed, whether there is material in the hopper, and whether the emergency stop button and belt of the batching station are normal. Check that there is no foreign matter stuck in the drive and moving parts of the mixing drum and supporting mechanisms, as well as the bin door, bucket door and track. Check whether there is oil in the oil storage tank of the mixer and whether the raw materials such as aggregate, powder, water and admixture are sufficient. Open the valves to discharge the excessive ponding of the gas-water separator in the gas circuit system, and open the blowdown plug of the air reservoir to discharge the oil-water mixture. After the key switch is turned on, each motor can be started only when the number on the display screen is on.

During manual weighing, the number displayed on the display screen is the cumulative value. If the displayed number does not jump or the pointer on the reading disk does not rotate, it indicates that the weighing is blocked. At this time, press the "vibrator" button to make the vibrator work. After the concrete in the mixing station is discharged and the discharge door is closed, the next operation can be carried out only after the "mixer empty" indicator light is on and the "mixer door open" indicator light is off. During the operation of the mixing plant, pay attention to its current value at any time, and check the correctness and reliability of the master switch, knob, button and indicator light. During production, we should concentrate on correcting the weighing error, vehicle volume and out of tolerance at any time, and pay attention to data storage. After the production is completed or the main machine is stopped for more than half an hour, the main machine must be cleaned. When discharging water, make sure that there is no one at the blanking port and the bell rings once.

The above are the precautions for using the concrete mixing plant. I hope it can help you. If you need products, you can contact us. Welcome to inquire!


label

0

Hotline

400-0531-567

Inquiry

contact us

Address: No. 818, Jingshi Road, Jinan, China

Tel: 0086-531-87453566

Fax: 0086-531-87453566

Postal Code: 250306

Email: sdjkgroup@163.com        

jianke3566@163.com


QR code

Copyright © Shandong Jianke Machinery Co., Ltd 鲁ICP备2021024699号-1 Specializing inAsphalt plant, stabilized soil mixing plant, concrete mixing plant equipment,Welcome to inquire! technical support:嵊灿科技 Business license